Fusion milestone tracker

Quarterly, web-verified tracker of the fusion climb — every row dated and sourced, denominators printed. Current version v1.5 (2026-10-01).

Back to the project hub.

THE finding

Nothing on Earth has engineering Q (Q_eng) > 0.03. The 2026 wave moved assembly, licensing and funding — not gain. Every “fusion is here” headline should be read against that number.

The honest milestone ladder

The ENN hydrogen-boron row (added v1.5)

ENN (Langfang) announced 2026-09-28: >1.0×10^8 hydrogen-boron reactions/s measured on EXL-50U (alpha-particle + proton-spectrum detection; ENN-convened unnamed international panel; non-thermal — NBI+RF fast protons at the ~148-keV p-B11 resonance). Python arithmetic: 10^8/s × 8.68 MeV = 1.4×10^-4 W ≈ 0.14 mW of fusion power ÷ ≥0.8 MW ECRH (one demonstrated heating subsystem; total input higher and unpublished) → ratio ≈ 1.7×10^-10; denominator printed. “First commercial company to achieve p-B11 fusion on its own device” is defensible as worded (TAE/NIFS 2023 measured it first in magnetic confinement, on NIFS's LHD; HB11 used the rented PALS facility); headlines stripping the qualifiers invite readers to hear net energy — this is ten orders of magnitude below even NIF's laser-wall ratio.

Demo-to-wedge

Demonstrated fusion energy → 1 TW average: ≥×10^7. Industrial gate: world REBCO superconducting-tape capacity ≈ one prototype reactor (the materials bottleneck, P2 lane).

Versions and cadence

v0 2026-09-23 → v1 2026-09-25 (full re-verification) → v1.1 2026-09-26 (laser-wall/site split; peak-vs-integrated column; milestone-capital caveat) → v1.2 2026-09-28 (threshold spans + wall multiple — outside auditors erratum and Aria) → v1.3 2026-09-29 (taxonomy relabel, rule #7) → v1.4 2026-09-30 (demo-to-wedge) → v1.5 2026-10-01 (ENN p-B11 row). Next refresh ~2026-12 (quarterly). Master: knowledge/05; appendable public mirror linked from the hub artifact table.